How to operate the concrete mixer accurately is the main factor to ensure the normal production. Therefore, in the production process of the concrete mixer, it is very useful to ensure the normal operation of the mixer and prevent some simple equipment damage. Next, I will introduce how to operate the concrete mixer safely and accurately during the construction process.
The mixer of the concrete mixer should be located on a flat and firm site and fixed. Add some water and wait to spin off the machine to drain completely, especially in winter.
Check to see if everything is in excellent condition. Such as drive clutches, wire ropes and pullers are good or bad. Unskilled workers should stay away from its feed opening, and no one should approach the mixer while it is working. It is forbidden to put anything into the drum when the concrete mixer is working,
When viewing the console of the concrete mixer, please be sure to cut off the power supply of the feeding hopper. The program driver must have received professional training and passed the test. Remember to clean the mixer every day. Except for normal inspection, the machine should be in charge of a professional engineer
In the process of using the concrete mixer, if the normal operation of the concrete mixer can be well maintained, it will be able to ensure the service life of the equipment and the normal progress of the project construction.